管理番号20110000000489
タイトル*平成22年度中間年報 国際エネルギー消費効率化等技術普及協力事業 新交通情報システム技術実証事業(中国)
公開日2011/5/10
報告書年度2010 - 2010
委託先名日産自動車株式会社
プロジェクト番号P93050
部署名エネルギー対策推進部
和文要約和文要約等以下本編抜粋:1.実証事業の内容及び成果等
(1)実証事業の内容
本事業では、急速なモータリゼーションを迎える中国北京市を対象に、年々悪化する交通渋滞・エネルギー・環境問題を改善するために、北京市交通委員会と連携し、ドライバーに動的経路誘導(DRGS)とエコ運転支援(EMS)の情報を伝えるためのサービス提供システムとその効果検証システムを導入する。さらに技術を普及させていくため、社会効果の公開や標準化など、社会制度の仕組み作りを行う。媒体としては、車載機・スマートフォンを活用して幅広い利用者を取り込むことで、革新的に省エネルギー化を図る。
*DRGS;Dynamic Route Guidance System
*EMS;Eco Management System
英文要約Subject: Fiscal 2010 Interim Report: International Projects for Increasing the Efficient Use of Energy The Dissemination of Technology Project for Increasing the Efficient Use of Energy The Dissemination of Technology Project for the Technical Demonstration of the New Traffic Information System (China)
With the aim of addressing traffic congestion as well as energy and environment related issues, which are increasing every year in the city of Beijing in China, a service system consisting of dynamic route guidance system (DRGS), eco-management system (EMS) together with a verification system to evaluate the effectiveness of the service system will be introduced under this project to promote energy saving and the reduction of CO2 and to demonstrate the effectiveness of these systems. Moreover, the activities for promoting these technologies in China by means of demonstrations and promotion activities will be carried out with the project. In fiscal 2010 (1) As an undertaking related to the field work and agreement, a draft memorandum of understanding was drawn up; and on the 24th October 2010 a Implementation Document was signed between Nissan Motor Co., Ltd. and the Beijing Municipal Commission of Transport. (2) As a design-related undertaking, the specifications were determined for the service systems (DRGS and EMS), the Verification System, the Verification Publication System and in-vehicle devices, and carried out basic design and some of detail design for above systems. (3) As preparation in advance of the manufacture and transportation of equipment, the production or purchase of licenses, simulation functions, some hardware and middleware was undertaken. (4) As preparation in advance of the demonstrations, a study was made of methods for managing operation of the demonstrations. In addition, a study was made of methods of verification of the social and user effects accompanying the introduction of DRGS and EMS, and these were compiled into a list of definitions of prerequisites regarding the verification of the effects. (5) A basic plan for promotion activities was drawn up and consultation and coordination with the Beijing Municipal Commission of Transport was carried out with regard to the content of the activities, roles, schedules, etc.