和文要約和文要約等以下本編抜粋:1.実証事業の内容及び成果等 【内容】(1)現地調査・協定関連業務 平成21年度にて実施済み (2)設計 平成21年度にて実施済み (3)機器製作 ・ACCS 制御システム ハードウェア ・ACCS 管理システム ハードウェア ・センサー機器類 (4)据付・試運転 (5)実証運転 (6)普及活動 (7)CDM 関連業務
英文要約Title:The International Project for Increasing the Rational Use of Energy The Model Project for Increasing the Efficient Use of Energy 「Coke Oven Automatic Combustion Control System」 in Shanxi Province, Peoples’ Republic of China (FY2009-FY2011)’ FY 2010 Annual Report
1. Outline of the Model Project The purpose and target of the study are feasibility study of energy-save by adopting ‘Coke Oven Automatic Combustion Control System’to Chinese coke industries. This project have organized by a selection of most adequate firm, scale, measures which have done by a contribution of a host country’s public organization. And also this includes several items of study as follows; a study on possibility of joint implementation with the selected coke firm in China, pursuing a possibility of applying for CDM, and examining probability of expansion and popularization of the technology of 'Coke Oven Automatic Combustion Control System’ in China. The research and survey items which were executed during the period of FY 2010 are as follows : (1) Detail design of the ACCS control system (2) Detail design of the ACCS manage system (3) Detail design of the sensors that measure temperature, fuel flow rate, fuel calorie and Oxygen. (4) Installation and trial run of the ACCS system (5) Demonstration run of the ACCS system (6) Potential and probability of the technology’s expansion into the coking industry in China (7) Preparation work for CDM application 2. Results and conclusions as of FY 2010 (1) Detail design of the ACCS control system has been done. (2) Detail design of the ACCS manage system has been done. (3) Detail design of the sensors that measure temperature, fuel flow-rate, fuel-calorie and oxygen density has been done. (4) The system equipment had been transported to the site in China and been installed on the site. (5) The trial RUN had been done for the ACCS system that was installed to No. 5 and 6 Coke oven plant (6) The trial RUN have been commenced for the ACCS system that was installed to No. 3 and 4 Coke oven plant (7) The demonstration RUN has been started. (8) The draft "PDD" document for CDM application has been prepared.
ダウンロード成果報告書データベース(ユーザ登録必須)から、ダウンロードしてください。

▲トップに戻る