本事業では、タイ国内で豊富に存在する未利用農林残渣であるバガスを原料とした次世代エタノール製造技術をパイロット規模で実証する。この次世代エタノール製造技術を確立することで、上記課題の解消を図り、今後のタイ国及びアジア諸国
における普及を目的とする。
英文要約Title: Model Project for Bioethanol Production from Bagasse Using Enzyme Method in Thailand (FY2011-FY2014) FY2011 Annual Report

In Thailand, The government proceeds the policy to expand fuel ethanol for energy security of own country. Now, Fuel ethanol is produced mainly from molasses and remaining from cassava. It is difficult to use molasses and cassava to expand ethanol because there are considered as a kind of food. For this reason, next generation ethanol production technology, which utilizes non-food cellulosic feedstock, is expected to be established as soon as possible. In this model PJ, the technology of fuel ethanol production technology from bagasse, which is a kind of cellulosic biomass and has abundant resources in Thailand, will be demonstrated by the pilot scale test. It must be the fastest and best way for expanding cellulosic ethanol process in Southeast Asia including Thailand to establish total process for converting cellulosic biomass. We apply the enzyme (Cellulase) to produce ethanol from cellulose in bagasse. This process shows high efficiency and low environmental effects. And the feature is to produce cellulose on-site with Japan origin micro-organism. We will accumulate the data from the proposed pilot scale facilities and proceed to the commercialization. The demonstration plant will be constructed at TRE factory in Saraburi, Thailand. Japan and Thailand will cooperate carrying out this model project such as demonstration operation and dissemination activity. This model project from FY2011 to FY2014 has these works as follows; 1.Site Survey/Concluding the Implementation Document, 2.Basic / Detailed Design work, 3.Equipment Fabrication/Transportation, 4.Constraction of the plant / Commissioning, 5.Demonstration operation, 6.Dissemination. In FY2011, we carried out these works from 1. to 2. 1. Site Survey/Concluding the Implementation Document; we implemented the site survey to conclude the implementation document. In addition, we attended the kick ? off meeting between NEDO and OCSB and supported the documentation for singing the minutes of understanding. 2. Basic / Detailed Design work; we and TRE agreed the work sharing of this model project. As outlined in the agreement, we started the basic and detailed design work of the demonstration plant.
ダウンロード成果報告書データベース(ユーザ登録必須)から、ダウンロードしてください。

▲トップに戻る