成果報告書詳細
管理番号20120000001017
タイトル*平成23年度中間年報 バイオマスエネルギー技術研究開発 戦略的次世代バイオマスエネルギー利用技術開発事業(実用化技術開発) 接触分解法による廃食油からのバイオディーゼル燃料製造の研究開発
公開日2012/12/21
報告書年度2011-2011
委託先名株式会社フチガミ ウェスティックテクノロジー株式会社
プロジェクト番号P10010
部署名新エネルギー部
和文要約和文要約等以下本編抜粋:1. 研究開発の内容及び成果等
(1) ミゼットプラント実験結果一次データ検証
平成23年3月の東日本大震災の影響によりミゼットプラント製作及び分析計の納品が遅れ、ミゼットプラントの完成は4月28日になり、それ以降試運転によるプラントの機能確認を実施、その後5月連休明けより本格的実験を開始した。
英文要約Title: Development of Bio Diesel Fuels from Waste Vegetable Oil using Catalytic Cracking
FY2011 Annual Report
First term of FY2011, miniature plant construction had extremely delayed by influence of the mega earth quake of the east Japan. Miniature plant was completed end of April for the basic experimental operation. And experimentation operations started after the vacation of May.
The miniature plant has a capacity of maximum 600mL/Hr as oil supply (LHSV3.0). Reactor were prepared 2 set, each reactor contains 200mL of catalyst. Reactor were prepared 2 set, this reasons is as a primary reactor shall be carbonized easily by advice from Kitakyushu University. Reactor size is 1.0 inches inner diameter and 500mm total heights. Reactor heaters were prepared each 1.0kW electric seas heater coiled over outer diameter of the reactor. Supply pump was prepared maximum 1.5L/hr for source oil and water, and high pressure (20mPa) nitrogen bombe was prepared as an inert carrier gas. Supply vessel volume is 10L, receiver vessel is 20L.After the miniature plant was delivered, experimental operations were started. By the first step, disintegrated oil came out easily, but acid value of disintegrated oil was high.
To find the solution of this problem, numerous countermeasures were examined, as for example heat distribution of the reactor, and methods of pouring source oil. However, recreation could not confirm the university examined results. At the next step, methodology of pouring source oil changed to up flow from down flow for maximize of the space of catalyst. At this step, pretty good results were obtained. At the next step, fist reactor size was enlarged for the materialization of scale up. The experimental operation were continued till now. FY 2011 was finished at this stage.