Contents and Results of R&D
(1) Examination of executing methods of the demonstration experiment and making of project execution planning
The execution method and evaluation items of the demonstration test were examined about the following items described in the execution plan in 2010 fiscal year.
1) Stabilization of distribution line by load flow control at PCC of the commercial building.
2) High reliable and stable power supply by the BEMS control in the islanded mode.
3) Power load tracking control using thermal storage type air -conditioning system.
4) Demonstration on the improvement of PCS robustness of PV generation.
5) Performance evaluation during high-altitude operation.
6) Performance evaluation during high-altitude operation.
7) Demonstration and evaluation of advanced lead-battery operation management system.
8) Demonstration and evaluation of advanced lead-batteries.
9) Performance evaluation of PV generation system.
  
(2) Enforcement design and construction of demonstrative experiment system
 On the basis of above-mentioned (1), the enforcement design of the demonstrative experiment system, production of the BEMS control system, and the equipment procurement of the charge part were performed.
In addition, the facing examination of each company’s equipment and BEMS were done in Japan. Then, export of BEMS and procure equipment were performed for the U.S.
After that, equipment setting and the construction of demonstrative experiment system were carried out and the trial run adjustment of the experiment system was performed in the test field. In this process, in order to obtain recognition of UL substitution about the equipment carried from Japan, the inspection by PE which the State of NM authorized was undergone, and recognition for all equipment were obtained. Moreover, the interconnection application of the experiment system was made to PNM.

(3) Supervision about a design and construction of demonstration facilities
 About the business district smart grid demonstration facility built in Albuquerque city, supervision for design and construction were carried out.
In addition, among the system smart grid proof facilities to build in the Los Alamos county, supervision for construction about the part except PV generation facilities were carried out.