成果報告書詳細
管理番号20140000000126
タイトル*平成25年度中間年報 国際エネルギー消費効率化等技術普及協力事業 馬鈴薯澱粉残渣からのバイオエタノール製造実証事業(中国)
公開日2014/5/2
報告書年度2013 - 2013
委託先名双日株式会社 日立造船株式会社
プロジェクト番号P93050
部署名新エネルギー部
和文要約
英文要約Title : Projects for Increasing the Efficient Use of Energy, “The Model Project for Bio-ethanol Production from Residues of Potato Starch in China” (FY2011-FY2015) FY2013 Annual Report

With a dramatic increase in the number of cars, gasoline consumption in China has been increasing remarkably. On the other hand, the Chinese government does not allow building new ethanol production plants which produce ethanol from foods such as corn, in order to avoid the soar of food prices. This project aims to solve these issues by introducing the technology of bioethanol production from residues of potato-starch to Keshan potato-starch factory of Heilongjiang Bei Da Huang Potato Group, and to spread the technology. In FY2013, (1) The work related to the agreement, and (2)Work for engineering and project supervision and management were carried out. Regarding (1) The work related to the agreement, we, Sojitz Corporation and Hitachi Zosen Corporation performed the support work for the conclusion of MOU (Memorandum of Understanding) between NEDO and Chinese organization. In particular, we conducted a survey about the possibility of the conclusion of MOU between NEDO and Chinese local government, and reported about it to NEDO. Regarding (2) Work for engineering and project supervision and management, we carried out followings;(a)Basic plan / basic design - we reviewed the process design and studied the optimization of the demonstration facility. - we made basic design drawings.(b)Design study together with National Institute of Advanced Industrial Science and Technology (AIST) - we studied the grade change of the necessary chemicals in production of the enzyme. - we performed the test of the saccharification and fermentation of the potato starch residue with bench scale.(c)Detailed design - we made equipment specifications, piping specifications, piping layout plan, control system diagram, instrument lists. - we got the estimation of equipment, instrument, instrumentation valve, and power control panel, and evaluated it. - we supervised and administrated the overall project, including the project progress and design. - we negotiated and adjusted with other companies/organizations about the matters related with the project.
ダウンロード成果報告書データベース(ユーザ登録必須)から、ダウンロードしてください。

▲トップに戻る