成果報告書詳細
管理番号20130000000891
タイトル*平成24年度中間年報 国際エネルギー使用合理化等対策事業 国際エネルギー消費効率化等モデル事業 セメント工場におけるバイオマス及び廃棄物の有効利用モデル事業(マレーシア)
公開日2014/6/21
報告書年度2012 - 2012
委託先名太平洋エンジニアリング株式会社
プロジェクト番号P93050
部署名新エネルギー部
和文要約
英文要約Title: The Model Project for Alternative Fuel Combustion in the Cement Industry (Malaysia) (FY2008-FY2013) FY2012 Annual Report

TEC made proposals and supports in order to precede ID conclusion through decision by Board and concluded ID with CIMA on June 20th 2012. On July 18 and 19th 2012, kickoff meeting was held at NSCI's Bahau plant and scope of works, whole work schedule, transportation schedule of equipment from Japan, interference with No 2 line work and its solution were discussed. Based on CIMA's recommendation and evaluating technical and financial matters, Seong Henng Engineering Works (M) S.B. was selected and contract on locally fabricated machinery was concluded on Nov. 19th 2012. Since Jan. 2013, TEC stationed a supervisor at the said firm for scheduling and quality control. On July 24th 2012, repacking (about 1,000m3) by fumigated material was conducted on a part of equipment kept in warehouse. Equipment from Japan was shipped in October 2012 by CIF Port Klang and now kept at Bahau plant of NSCI under CIMA (and partially warehouse at Port Klang. The said custody in warehouse requires inspection and maintenance of equipment before erection. A part of such equipment, lift conveyor, was tested on Jan 22nd 2013 at relevant workshop in Malaysia and no specific problem was found. On Nov. 20th to 22nd 2012, meeting with CIMA was held on whole work schedule. Detailed schedule of equipment was made and it was agreed that the entire schedule should be completed by end of October, 2013. At inspection made in end December 2012 TEC was explained by CIMA that the work was almost on schedule. However, it was clarified that the schedule was tend to be delayed in end Jan. 2013, so TEC made inspection of present situation with CIMA and pressed to carry out urgently in beginning February 2013. According to CIMA, due to approval process in CIMA's in-house made delay of placing order to contractors as compared with the schedule planned in November 2012. Therefore TEC send reminder proposing discussion between directors of both parties on Feb. 13th 2013 and meeting was held at CIMA's KL office on Feb. 27th 2013. As a result, CIMA explained that placing order to civil contractor should be made urgently and erection contractor will be decided in early April. According to latest schedule by CIMA, it was confirmed that Project is to be completed by end Nov. 2013. Further TEC requested CIMA to make effort to accelerate placing order, shorten schedule and bring work progress towards commissioning according to agreement in Nov. 2012, so that to secure sufficient time for commissioning.
ダウンロード成果報告書データベース(ユーザ登録必須)から、ダウンロードしてください。

▲トップに戻る