成果報告書詳細
管理番号20150000000357
タイトル*平成26年度中間年報 国際エネルギー消費効率化等技術普及協力事業 酵素法によるバガスからのバイオエタノール製造技術実証事業(タイ)
公開日2015/6/16
報告書年度2014 - 2014
委託先名月島機械株式会社 JFEエンジニアリング株式会社
プロジェクト番号P93050
部署名新エネルギー部
和文要約
英文要約Title: Model Project for Bioethanol Production from Bagasse Using Enzyme Method in Thailand
(FY2011-FY2016) FY2014 Annual Report

In Thailand, The government proceeds the policy to expand fuel ethanol for energy security of own country. Now, Fuel ethanol is produced mainly from molasses and remaining from cassava. It is difficult to use molasses and cassava to expand ethanol because there are considered as a kind of food. For this reason, next generation ethanol production technology, which utilizes non-food cellulosic feedstock, is expected to be established as soon as possible. In this model PJ, the technology of fuel ethanol production technology from bagasse, which is a kind of cellulosic biomass and has abundant resources in Thailand, will be demonstrated by the pilot scale test. It must be the fastest and best way for expanding cellulosic ethanol process in Southeast Asia including Thailand to establish total process for converting cellulosic biomass. We apply the enzyme (Cellulase) to produce ethanol from cellulose in bagasse. This process shows high efficiency and low environmental effects. And the feature is to produce cellulose on-site with Japan origin micro-organism. We will accumulate the data from the proposed pilot scale facilities and proceed to the commercialization. The demonstration plant will be constructed at TRE factory in Saraburi, Thailand. Japan and Thailand will cooperate carrying out this model project such as demonstration operation and dissemination activity. This model project from FY2011 to FY2014 has these works as follows; 1.Site Survey/Concluding the Implementation Document, 2.Basic / Detailed Design work, 3.Equipment Fabrication/Transportation, 4. Construction of the plant / Commissioning, 5.Demonstration operation, 6.Dissemination. In FY2014, we carried out these works from 1. to 4. 1. Site Survey/Concluding the Implementation Document; we implemented the site survey to conclude the implementation document. TSK JFE and TRE contracted IMPLEMETATION DOCUMENT on June 2014. 2. Basic / Detailed Design work; we conducted the basic and detailed design work. 3. Equipment Fabrication/Transportation; Equipment were fabricated and transported based on our design work. 4. Construction of the plant / Commissioning; we started the construction work for demonstration plant.
ダウンロード成果報告書データベース(ユーザ登録必須)から、ダウンロードしてください。

▲トップに戻る