成果報告書詳細
管理番号20150000000699
タイトル*平成26年度中間年報 国際エネルギー消費効率化等技術・システム実証事業 (実証要件適合性等調査) 次世代省エネ型輻射式冷房システムのマレーシア普及展開に向けた実証前予備調査
公開日2016/3/1
報告書年度2014 - 2014
委託先名株式会社エコファクトリー 株式会社レノバ
プロジェクト番号P93050
部署名イノベーション推進部
和文要約
英文要約Title:Feasibility Study of the Next Generation, Energy-Saving and Panel Cooling Air-Conditioning System in Malaysia (FY2014-FY2015) FY2014 Annual Report

1: Building of relationship between the Government of Malaysia (GoM) and the Study Team (Ecofactry and Renova.Inc.)
The Study Team has visited MiGHT (Malaysya, Selangor) and Melaka GreenTechnology Corporation (Melaka), explained about the abstract of this Baseline Study, consulted on the MOU signers, and requested in the candidate- sites of the pilot project. MiGHT has made a proposal for the candidate office building for the demonstration project. We will discuss further on various conditions to decide whether this site is desirable or not for the project.
Study Content
2: Market Research and Understanding of Concrete Needs on Energy Saving System
The Study Team has conducted literature review on general information in Malaysia, such as climate change and power market situation, and supporting system for promotion of energy saving. From the study as of now, the Study Team has understood that the power demand for industry use has declined whereas the power demand for commercial places and households has increased. Since the new energy policy called the Green Building Index (GBI) credit system can be the target of the technology of the Team, the Team will conduct interviews to the local government on the concrete contents and any preferential treatment of the GBI.
Study Content
3: Identification of the Pilot Project Site (Ecofactry)
The Study Team has visited FGB (a private company that manages and operates national medical institutions in Malaysia) and KMB (a private company that manages and operates various national facilities in Melaka), explained about the abstract of this this Baseline Study and requested information of equipment or buildings which can match and can effectively apply the technology of Ecofactory.
FGB and KMB have agreed to provide information on the purpose, scale, structure, and A/C system of the equipment or buildings which can be candidates of the pilot project.
The Study Team has conducted the field study of a convention hall, a bethel of steel-frame structure, and a Badminton hall, which were the recommended candidate sites of the pilot project, and checked through the match the technology and effectiveness of the technology.