成果報告書詳細
管理番号20150000000701
タイトル*平成26年度中間年報 国際エネルギー消費効率化等技術・システム実証事業 (実証前調査) 火力発電所放流渠を活用したマイクロ水力の並列配置発電システム技術実証事業 (インド共和国)
公開日2016/3/1
報告書年度2014 - 2014
委託先名日本アジアグループ株式会社 シーベルインターナショナル株式会社 双日マシナリー株式会社
プロジェクト番号P93050
部署名イノベーション推進部
和文要約
英文要約Title "International Demonstration Project of Energy consumption efficiency technology and system / Investigation before demonstration / Parallel micro hydro power generation system technology using thermal power plants’ discharge culvert" (FY2014 -FY2015)FY2014 Annual Report.

Contractors:Japan Asia Group Co., Ltd. Seabell International Co., Ltd. Sojitz Machinery Co., Ltd.
1. The contents of the demonstration projects and achievements, etc.
(1) Overview of demonstration projects
1) Outline of the assumed system demonstration project
With expansion of Indian domestic energy demand, the patented technology of Seabell International’s Ultra Low Head will be used in Indian thermal power plants. Using around 12 machineries of single output 30kW, to perform the demonstration project in total output 360 kW. The demonstration site will be currently TATA POWER’s thermal power plant in Mumbai City.
2) Overview of investigation before demonstration
Assuming the implementation of the above systems’ demonstration project, has already begun a study of the overall plan in FY2014. Will start negotiation from FY2015 for the ID to make rapid commercialization.
<1> The implementation plan and detailed planning of the system demonstration project
Towards the creation of ID draft for the implementation demonstration projects, detailed examination has been proceeded, and arranged the kick-off meeting with local counterpart. Furthermore studying SPEC of machinery enduring in salt rich atmosphere because the thermal power plant is using seawater for cooling system. Also started to consider method to place multiple devices in parallel to the discharge groove of thermal power plants.
<2>Dissemination feasibility study of this technology
Studied market size and made collection of the data of large scaled thermal power plants in India. Will proceed whole evaluation of market potential with studying business costs and profit.
<3>Compatibility of success factors of past demonstration projects
Examined the appropriate maintenance formation, manufacturing system and sales for dissemination in the future in India. Deeper investigation will be made in FY2015 for the large achievement in India.
<4>Evaluation of Commercialization
Based on the examination of the above, will create the report documents of commercialization in FY2015 afterward.
2. Outcome (Described only for FY2014)
(1). Research presentations and lectures (including oral presentation) None
(2). Patent, etc. None
(3). Award-winningNone
3. Other Notices (Described only for FY2015)
(1). Effort of Dissemination (press releases, etc.) None
(2). OtherNone