成果報告書詳細
管理番号20120000000248
タイトル*平成23年度中間年報 アジア等地域における現地適用型インフラシステム技術実証開発事業 カンボジア王国農村地域における籾殻などバイオマスを利用したエネルギー・環境技術実証開発事業
公開日2016/4/15
報告書年度2011 - 2011
委託先名ヤンマーグリーンシステム株式会社 株式会社環境総合テクノス
プロジェクト番号P11015
部署名国際部
和文要約
英文要約Interim Report :

1. Preliminary study and report preparation
Studies have been carried out to confirm the following assignments to promote this project.
(1) We have concluded that the implementation of our project in the province of Takeo where we use the land owned by Khemarak as the pilot plant site. It has an advantage over the implementation of the same in the other provinces due to the following background; the natural & social condition, the electric power supply condition, the renewable energy scheme, the business plan and the agricultural situation.
(2) We have listed up our work & cost sharing with Khemarak.
(3) We have pre-calculated the total impact of alternative energy resources by the utilization of rice husk gasified power generation and carbonized heat would be 69,300,000 MJ/yr. and the total reduction would be 4,700 t-CO2/yr..
(4) To draw up the overall plan of project, we have streamlined the important items of construction process control and then we have drawn up the schedule of f application test of KUNTAN effect. We have pre-calculated the total cost of this project which would be \ 534 million Japanese Yen (consumption tax included) for the entire project period.
(5) We have assessed the economic efficiency of this project. According to our assessment, we have pre-calculated the internal rate of return (IRR) would be 34.42% which the investment recovery would be achieved a surplus in the 2nd year.
(6) Followings are our overall assessment on thepilot plant site;
  /The geographical conditions are favorably located for the export of polished rice.
/We have found the problem in the consolidating operation of paddy.
/We recommend to enhance the alignment of each facility in the area of engineering & energy and to improve the rate of rice husk gasification.
/There is a good chance for the dissemination effect of this project.
Cambodian government is working closely on the agriculture promotion in the province of Takeo.

2. Conclusion of Implementation Document (ID)
Implementation Document w/Technical Specs as Appendices has been concluded between YGS and Khemarak on the day of November 30th, 2011 upon the confirmation made on
facility, installation and cost sharing by the two parties.

3. Equipment designing
We have set up the specs of equipment configuration. We have also prepared the required
architectural reference documents for the construction work.

4. Effect test of KUNTAN
(1) The testing location is the station at Takeo Office of Cambodian Ministry of Agriculture in the province of Takeo. We have set up the testing design including the applied volume of
KUNTAN, the testing crop and the method of application. The testing field which KUNTAN would be fed are vegetable & rice growers’ farmlands.
(2) KUNTAN will be produced at Takeo Office of Cambodian Ministry of Agriculture where the simple carbonizing furnace is held for use. The application test will be started in April, 2012.