成果報告書詳細
管理番号20160000000221
タイトル*平成27年度中間年報 国際エネルギー消費効率化等技術普及協力事業 産業廃棄物発電技術実証事業(ベトナム)
公開日2016/6/15
報告書年度2015 - 2015
委託先名日立造船株式会社
プロジェクト番号P93050
部署名新エネルギー部
和文要約
英文要約Title: International Projects for Increasing the Efficient Use of Energy demonstration project for an industrial waste power generation system in the Socialist Republic of Vietnam (FY2012 - FY2016) FY2015 Annual Report

In Vietnam energy shortages and environmental pollution have become serious issues as a result of its rapid economic growth, and countermeasures that address these issues have become necessary. Although industrial waste is disposed of in landfills, the availability of landfill sites is reaching the limit. This issue is needed to be addressed as quickly as possible by reducing industrial waste volume. Against this backdrop, this demonstration project construct a waste power generation system using an industrial waste incinerator of rotary kiln stoker furnace which has been widely installed in Japan, to incinerate industrial waste collected from shoe factories, garment factories and etc at a disposal site of the Hanoi Urban Environment Company Ltd. in Nam Son. This system will demonstrate to advance to resolve energy and environmental issues in Vietnam. Using the results obtained through the demonstration of the system, this project also aims to promote the system in Vietnam and Southeast Asian nations. Japan and Vietnam will cooperate carrying out this model project such as demonstration operation and dissemination activity. Our work of this project is as follows. 1) Site survey and work related to contract, 2) Basic planning, 3) Basic and detail design, 4) Design, manufacturing and procurement of mechanical, electric and instrument equipment, 5) Transportation and insurance, 6) Construction work, 7) Commissioning work, 8) Promotion. In FY2015, we carried out in the following works. 1) Basic planning; The period of commissioning was decided to extend from May 18, 2016 to Dec. 26, 2016 due to delay of license of connecting to national grid, bid of EPC, etc.. 2) Basic and detail design; Issued of the all manuals with regard to operation & maintenance of the installed equipment and commissioning procedure. 6) Construction work; Installation work of equipment started in June 11,2015. For the installation of Japan scope equipment, we dispatched of engineer overall supervision and management for installation and witnessed the unpacking inspection.
ダウンロード成果報告書データベース(ユーザ登録必須)から、ダウンロードしてください。

▲トップに戻る