管理番号20160000000213
タイトル*平成27年度中間年報 水素社会構築技術開発事業 水素エネルギーシステム技術開発 北海道に於ける再生可能エネルギー由来不安定電力の水素変換等による安定化・貯蔵・利用技術の研究開発
公開日2017/4/8
報告書年度2015 - 2015
委託先名豊田通商株式会社 株式会社NTTファシリティーズ 川崎重工業株式会社 株式会社フレイン・エナジー 株式会社テクノバ 国立大学法人室蘭工業大学
プロジェクト番号P14026
部署名新エネルギー部
和文要約
英文要約Technology Development for the Realization of the Hydrogen society/Technology Development of Systems using Renewable Energy-derived Hydrogen/R&D on Stabilization, Storage and Utilization of Unstable Renewable Electricity In Hokkaido Using Hydrogen-Based Technologies

1) R&D on Stabilization Technology for Renewable Electricity through Hydrogen Production
The newly developed electrolyzer with laboratory-scale capacity has achieved basic performance. Using the electrolyzer as the core component, the demonstration-scale system and facility were designed and built up. These system and facility comply with relevant codes and standards as well as in-house safety standards for the facility with hydrogen.

2) R&D on “Smart Control” Logic on Hydrogen Production, Storage and Utilization
By analyzing specification, performance and cost of components for demonstration system, proper system capacity of components (hydrogen storage, battery and others) was identified and optimized.
For the development of wind-power generation forecasting algorithm, the logic for the development of the algorithm to achieve the final target of 20% feed-in of wind-generated electricity into the grid was established.

3) R&D on Compact and Stable Storage Technologies of Renewable Hydrogen using Chemical Hydride Pathway

This R&D item will be conducted after the installation of the electrolyzer system and hydrogenation system in 2017.

4) R&D on Improvement of Catalysts for de-hydrogenation of Chemical Hydrides
By conducting the evaluation of catalysts activities in the reactor, the mid-term target on dehydrogenation was achieved.

5) R&D on Utilization of Renewable Hydrogen
By analyzing potential application of renewable hydrogen, the following application systems were identified and their specifications and performance were evaluated.
- LPG/hydrogen co-combustion boiler for public buildings
- Fuel cell to compensate imbalance

6) Assessment of Business model and Development of Deployment Plan for the System
By organizing three meetings of wind-power stability-technology committee and by working with other partners, the following mid-term targets have been achieved.

i) Setting of electricity price and hydrogen price
ii) Setting of scale-up factor
iii) Setting of KPI
iv) Conducting of sensitivity analysis based on KPI
ダウンロード成果報告書データベース(ユーザ登録必須)から、ダウンロードしてください。