タイトル*平成28年度中間年報 国際エネルギー消費効率化等技術普及協力事業 産業廃棄物発電技術実証事業(ベトナム)
公開日2017/5/11
報告書年度2016 - 2016
委託先名日立造船株式会社
プロジェクト番号P93050
部署名新エネルギー部
和文要約
英文要約Title: International Projects for Increasing the Efficient Use of Energy demonstration project for an industrial waste power generation system in the Socialist Republic of Vietnam (FY2012 - FY2017) FY2016 Annual Report

In Vietnam energy shortages and environmental pollution have become serious issues as a result of its rapid economic growth, and countermeasures that address these issues have become necessary. Although industrial waste is disposed of in landfills, the availability of landfill sites is reaching the limit. This issue is needed to be addressed as quickly as possible by reducing industrial waste volume. Against this backdrop, this demonstration project construct a waste power generation system using an industrial waste incinerator of rotary kiln stoker furnace which has been widely installed in Japan, to incinerate industrial waste collected from shoe factories, garment factories and etc at a disposal site of the Hanoi Urban Environment Company Ltd. in Nam Son. This system will demonstrate to advance to resolve energy and environmental issues in Vietnam. Using the results obtained through the demonstration of the system, this project also aims to promote the system in Vietnam and Southeast Asian nations. Japan and Vietnam will cooperate carrying out this model project such as demonstration operation and dissemination activity. Our work of this project is as follows. 1) Site survey and work related to contract, 2) Basic planning, 3) Basic and detail design, 4) Design, manufacturing and procurement of mechanical, electric and instrument equipment, 5) Transportation and insurance, 6) Construction work, 7) Commissioning work, 8) Promotion. In FY 2016, we carried out in the following works. 1) Basic planning; Signed of amendment to ID was decided to extend to 31 March, 2018 due to delay of license of connecting to national grid, bid of EPC, etc.. 2) Basic and detail design; Issued of the commissioning procedure. 6) Construction work; Installation work of equipment completed on end of December, 2016. 7) Commissioning work,: The commissioning was in accordance with the commissioning procedure delivered to partner by us as well as under the advice and guidance of our project representative or other personnel designated by us. We confirmed in the event the functions of EQUIPMENT during commissioning are in conformity with design requirements as provided in ID by end of March, 2017. Industrial waste 75t/d collected by partner was stably burn out with rotary kiln stoker-type incineration and generated 1,930kW electricity by using heat recovered from flue gas. The generated electricity was able to connect to the national grid, approx. 1,200kW electricity was also provided to outside of the plant.
ダウンロード成果報告書データベース(ユーザ登録必須)から、ダウンロードしてください。

▲トップに戻る