タイトル*平成28年度中間年報 「国際エネルギー消費効率化等技術・システム実証事業/インド共和国(印国)におけるスマートグリッド関連技術に係る実証事業」に係る実証事業
公開日2017/6/8
報告書年度2016 - 2016
委託先名富士電機株式会社 住友電気工業株式会社
プロジェクト番号P93050
部署名スマートコミュニティ部
和文要約
英文要約Contents and Achievements of Demonstration Project

(1) Demonstration System Construction (Fuji Electric)
(a) System Construction for Training Center
Fuji Electric has constructed the training system at Haryana Power Training Institute (HPTI), the training facility of UHBVN in Panchkula, Haryana State, for the system operator education.
・A simulation system has been constructed by two VCB and six LBS in two feeders which connected at one conjunction point.
・Outage Management System, Meter Data Management System, SCADA System, and Head End System have been constructed for training purpose in the same way as the Panipat Operation System.
・System Operator Education has been implemented to UHBVN.
- SCADA education
- AMI/Smart Meter education
- Outage Management System education
- Meter Data Management System education
- VCB・LBS equipment education
(b) System Construction for Panipat
Construction work for Panipat Operation Center is scheduled to be completed by the end of March, 2017. System construction for Panipat will be implemented continuously in next fiscal year.

(2) Smart Meter Design (Fuji Electric)
・BIS Certification for single phase smart meter has been acquired.
・BIS Certification for 3 phase smart meter is scheduled to be acquired in April, 2017.
・600 Non-BIS RF Mesh smart meters have been installed at Panipat demonstration field, and pre-field test for RF Mesh communication has been implemented.
・The manufacture of single phase smart meter which acquired BIS Certification has been completed for 8,800 meters by the end of March, 2017.

(3) TWACS System Installation (Sumitomo Electric)
Sumitomo Electric has installed SCE and related equipment into three substations in Panipat, Haryana State, for building up TWACS system.
・SCEs and related equipment have been installed in three substations, as follows Mini-secretariat, Kutani-Road, and 13-17 substations.
・IPUs and related equipment have been installed in four feeders, as follows Salarganj, Devi Mandi, Conduit and Thesil camp feeders.
・Test meters for evaluating SCEs have been installed in these feeders, and communication test has been done.