管理番号20170000000438
タイトル*平成28年度中間年報 風力発電等導入支援事業 環境アセスメント調査早期実施実証事業 環境アセスメント迅速化研究開発事業(既設風力発電施設等における環境影響実態把握1)
公開日2017/7/6
報告書年度2016 - 2016
委託先名一般財団法人日本気象協会
プロジェクト番号P14023
部署名新エネルギー部
和文要約
英文要約Title: Environmental Assessment Study Early Implementation Demonstration Project/Environmental Assessment Accelerate Research and Development Business (Understanding of the actually environmental impact of existing wind turbine 1)(FY2016-FY2017)FY2016 Annual Report

1.Basic information investigation
For field survey, we conducted the basic information investigation on the following items by collecting the assesment reports of the wind power plant.
・Birds・Noise/Infrasound・landscape・Atmospheric environment under construction

2.Field survey
In October 2016, we started the field survey on the impact for birds, noise/Infrasound, and landscape.We will start the field survey on the atmospheric environment under construction in 2017, because the construction of the target wind power plants will be startred in 2017.

3.Summarized
Birds:We have developed the following plans. First, we will estimate the magnitude of the impact on the birds by the wind power project through field survey. Second, we will compare the field results with the prediction and evaluation of assessment reports.Specific examination items are as follows; changes in the home range of raptor's pair especially,“mountain hawk”,the pattern of migration of raptors, migrating pattern or property of goose and swans and estimation of the occurrence frequency of bird strikes on wind turbines with some bias correction.
Noise/Infrasound:We measured noise and infrasound around 8 existing wind farms and arranged the correspondence between the wind speed and the measured noise level, frequency characteristics of infrasound.
Landscape:We took photos of landscape from viewpoints around 10 existing wind farms, and analyzed parameters (e.g. angle of view, etc…) by using these photos.
The atmospheric environment under construction:On the basis of collected basic information, we decided the directions of analysis to simplify procedure for surveying and forecasting.

4.Technical committees
Technical committee was held twice. We got advice on the project from experts.