本文へジャンプ

成果報告書詳細
管理番号20170000000253
タイトル*平成28年度中間年報 「地球温暖化対策技術普及等推進事業 /ベトナム版VーBEMS開発によるホテル省エネ促進実証事業(Low Carbon Hotel(低炭素ホテル)普及促進)」
公開日2017/8/30
報告書年度2016 - 2016
委託先名日比谷総合設備株式会社 三菱UFJモルガン・スタンレー証券株式会社
プロジェクト番号P11013
部署名省エネルギー部
和文要約
英文要約 Contract Title: ‘“Demonstration Project for Dissemination and Promotion of Energy-saving Hotels by a Vietnamese Version of V-BEMS Development” (Dissemination and Promotion of Low Carbon Hotels) JCM Demonstration Project’
For FY2016 of the period from FY2013 to FY2017
Midterm Annual Report
Assignees: Hibiya Engineering, Ltd. Mitsubishi UFJ Morgan Stanley Securities Co., Ltd.

1. Project Description; The technology developed under this project helps efficiently implement energy-saving measures toward air conditioning, lighting and hot-water supply. These three applications account for 85% of the energy consumption in general hotels in Vietnam. 2. Content of Implementation and Result of this Fiscal Year. -Project’s monitoring based on JCM method, -Re-establishment of local support system with extension of the project period, -Presentation to Vietnam stakeholders of this project about implementation system installed (Result) -Registration as JCM Project on May 15, 2016, -Providing the Energy Monitoring Report monthly, -Revision of the Implementation Document with Ho Chi Minh City University of Natural Resources and Environment, -Agreement to continuous monitoring period for this Project with Energy Conservation Center Ho Chi Minh City (ECC-HCMC) -Enhancement of BEMS data backup by countermeasures from three directions from software, hardware, and power supply and LAN networks, -Data Collection of electricity consumption using heat source by hotel staffs (before using BEMS), -Start training to hotel staff and Energy Conservation Center Ho Chi Minh City (ECC-HCMC) staffs for using BEMS (Result) -Minimize of lack of Monitoring Data by enhancement of BEMS data backup, -Acquisition of reference data at Hanoi site for 11 months including lowest/highest temperature period, -Start operational management with quantitative data using BEMS from March 01, 2017 at each site -Confirmation of boiler operation with quantity control using logger measurement, -Confirmation of operation using recording data of heat pump water heater, -Maintenance for boilers and heat pump water heater (Result) -Confirmation of boiler operation properly with quantity control using logger, -Confirmation of installed heat pump water heater’s continuous works and its proper capacity. -Ensuring energy saving performance by inspection and cleaning of equipment and by replacement of consumables
ダウンロード成果報告書データベース(ユーザ登録必須)から、ダウンロードしてください。

▲トップに戻る