タイトル*平成22年度中間年報 国際エネルギー使用合理化等対策事業 国際エネルギー消費効率化等モデル事業 セメント工場におけるバイオマス及び廃棄物の有効利用モデル事業(マレーシア)
公開日2011/5/17
報告書年度2010 - 2010
委託先名太平洋エンジニアリング株式会社
プロジェクト番号P93050
部署名新エネルギー部
和文要約和文要約等以下本編抜粋:1.実証事業の内容及び成果等 (1)ID (Implementation Document:協定附属書)締結に向けての準備作業 CIMA(Cement Industries of Malaysia Berhad)とのID締結に向けた調整を進めていたが、平成21年12月のCIMA役員会において、本事業に使用するバイオマス及び廃棄物の供給に関するSupplierとのMOU締結がID締結(CIMA役員会による本事業の承認)の条件とされた。
上記条件の情報を入手して以降、太平洋エンジニアリング(株)はCIMAに対してSupplierとの交渉・MOU締結進捗確認、バイオマス及び廃棄物に関する情報提供等を行ってきた。
英文要約Summary of Interim Annual Report (2010) on the Model Project (Project) for Alternative Fuel Combustion in Cement Industry
While Taiheiyo Engineering Corporation (TEC) was proceeding adjustment towards the conclusion of ID with CIMA (Cement Industries of Malaysia Berhad), at the Board meeting in December 2009, the conclusions of MOU on supply of biomass and waste to be used for the Project between CIMA and the Supplier was made to be the condition of conclusion of ID, that is: the approval of the Project by CIMA's Board. Since the information mentioned above was obtained, TEC carried out confirmation of negotiation and MOU conclusion between CIMA and Supplier as well as proving information on biomass and waste to CIMA etc. In July 2010, CIMA informed of TEC that biomass supply contract with the Supplier was arranged and Board would make approval in beginning of August. But at Board meeting on 4th August, the biomass price fix contract for period corresponding to payout period of Project cost to be borne by CIMA was added to biomass supply contract with the Supplier as condition of Project approval and no approval by CIMA's Board was obtained. Since then TEC confirmed progress of negotiation between CIMA and the Supplier, provided information on biomass and waste etc. and made various proposal for facilitating the Project to CIMA but ID has not been concluded, as of March 31st, 2011. The design work on the Project has been completed. All the machinery including electric equipment to be procured in Japan have been manufactured in fiscal year 2010 and 95% of them are packed and kept in warehouse in Yokohama. Manufacturer in Osaka keeps control equipment in their warehouse. The machinery which Japanese manufacturer fabricated in Malaysia is kept in warehouse in Malaysia The machinery to be procured in Malaysia such as canning goods of belt conveyor, dryer, bag filter and all-purpose machinery of compressor have not been ordered since the conclusion of ID is unforeseen. The article in custody in Japan is not damaged due to East Japan Great Earthquake. By the way, charges for custody are incurring monthly and so earlier shipment is planned as soon as ID is concluded. MIDA (Malaysia Industrial Development Authority) permitted the exemption of import tax applied by CIMA on machinery and equipment.